
Power Apps Development Partner — Global Implementation Partner
Custom canvas and model-driven Power Apps connected to Microsoft Dynamics 365 F&O, Dataverse, and your business systems. Build mobile-first apps for shop floor, field service, approvals, and inspections — without heavyweight custom development.
Delivery
4-8 weeks
Platform
Web · Mobile
Connected to
D365 · M365
Common Use Cases
What Indian enterprises build with Power Apps
Shop floor mobile apps
Production reporting, quality checks
Field service & inspection
Offline-capable for site visits
Approval workflow apps
Purchase orders, expense claims
All apps connect to your D365FO, Dataverse, SharePoint, Teams, and 500+ third-party systems via Power Platform connectors.
Power Apps deliver 3-5x faster than custom development — with the same scalability, security, and integration depth.
What We Build
Complete Power Apps Development Services
From mobile-first canvas apps to data-heavy model-driven apps — connected to Dynamics 365, Dataverse, and your business systems.
Canvas App Development
Mobile-first, pixel-perfect apps for shop floor workers, field engineers, and frontline staff. Drag-and-drop UI design with full control over every screen, button, and workflow.
Model-Driven App Development
Data-rich business applications built on Dataverse. Ideal for sales pipelines, case management, inventory tracking, and any process where data structure matters more than UI customisation.
D365 F&O & CRM Integration
Seamless bidirectional sync with Dynamics 365 Finance and Operations and Dynamics 365 CRM. Read and write data, trigger workflows, and surface ERP data on mobile devices in real-time.
Custom UI/UX Design
Apps designed with your brand identity, role-based navigation, and intuitive workflows. Field-tested with end users for high adoption rates from day one.
Custom Connectors & APIs
Beyond the 500+ pre-built connectors, we build custom connectors to legacy ERPs, in-house systems, and third-party SaaS platforms that don't ship with native Power Platform integration.
Security, Governance & ALM
Role-based access control, data loss prevention (DLP) policies, environment management, and proper application lifecycle management (ALM) using Azure DevOps or GitHub.
Why Impacgo
Why Choose Impacgo for Your Power Apps Project?
Microsoft Dynamics and Power Platform specialists with deep D365FO integration expertise — not a generalist dev shop.
Microsoft Specialisation
We work exclusively in the Microsoft Dynamics and Power Platform ecosystem — deeper product knowledge than generalist development shops.
D365FO Integration Expertise
We've built dozens of Power Apps that read and write to D365 Finance and Operations. We know the entity APIs, security models, and integration patterns inside out.
Fast Delivery (4-8 Weeks)
Power Apps lets us deliver 3-5x faster than traditional custom development. You see working software in 2 weeks, go-live in 4-8.
Production-Grade Architecture
Not 'toy' apps. We build with proper ALM, environment strategy, automated testing, and CI/CD using Azure DevOps — apps that scale and stay maintainable.
Mobile & Offline-Capable
Field-ready apps designed for low-connectivity environments. Shop floor, warehouse, field service — your team never loses data.
Ongoing Support & AMS
Post go-live support with SLA-backed response times. Minor enhancements, performance tuning, and continuous improvement under managed services.
Our Process
Power Apps Development Process
A proven, agile methodology — discovery to go-live to ongoing support, in 4-8 weeks.
Discovery & Requirements Workshop
1-2 week structured workshop with your business stakeholders and end users. We map current processes, identify pain points, define user personas, and prioritise the app's feature scope. Deliverable: documented requirements, wireframes, and a fixed-scope proposal.
Solution Design & Architecture
We design the data model (in Dataverse or your existing system), security model (role-based access), connector strategy (D365FO, SharePoint, third-party systems), and ALM strategy (dev / test / production environments). Deliverable: technical design document and project plan.
Iterative Development & Weekly Demos
Agile sprints of 1-2 weeks each. We build screens, workflows, connectors, and security in each sprint. End-of-sprint demos let you provide feedback early and steer the app's direction. No surprises at the end of the project.
Integration & Testing
Power App connected to your D365FO, CRM, SharePoint, or custom systems. We run end-to-end testing covering happy paths, edge cases, offline scenarios, and security boundaries. Performance testing for load and concurrency.
User Acceptance Testing & Training
Your end users run real-world scenarios. We capture feedback, fix issues, and finalise the app. Role-based training programmes — written guides, video tutorials, and live sessions — prepare your team for go-live.
Go-Live, Support & Continuous Improvement
Production deployment with rollback plans. 2-4 weeks of hypercare immediately after go-live to fix any post-launch issues. Transition to ongoing AMS for minor enhancements, performance tuning, and version upgrades.
FAQ
Power Apps — Frequently Asked Questions
What is Microsoft Power Apps and how is it different from custom app development?
Microsoft Power Apps is a low-code platform for building custom business applications without writing extensive code. It lets you create both canvas apps (for mobile and tablet-first scenarios) and model-driven apps (for data-heavy business processes). Compared to traditional custom development, Power Apps delivers apps 3-5x faster, integrates seamlessly with Dynamics 365 and Microsoft 365, and is significantly cheaper to maintain over time — making it ideal for extending D365FO with mobile interfaces, automating internal processes, and digitising paper-based workflows.
How long does it take to build a Power App?
A typical Power App takes 4 to 8 weeks from kickoff to go-live. A simple departmental app (timesheets, approvals, basic inspections) can be delivered in 4 weeks. A complex Power App connected to Dynamics 365 F&O with offline support, role-based security, and custom workflows typically takes 6-8 weeks. Impacgo follows an agile delivery model with weekly demos so you see progress every sprint.
Can Power Apps connect to our existing systems like D365FO, SAP, or legacy databases?
Yes. Power Apps comes with 500+ pre-built connectors including Microsoft Dynamics 365 F&O, Dynamics 365 CRM, SharePoint, Teams, SQL Server, Oracle, SAP (via OData/REST), Salesforce, and many more. For systems without a standard connector, we build custom connectors using REST APIs. This means your Power App can read and write data to any business system you currently use.
Do Power Apps work offline for field workers and shop floor staff?
Yes. Canvas Power Apps support offline data capture — perfect for shop floor production reporting, field service inspections, warehouse stocktakes, or remote site visits where connectivity is intermittent. Data syncs automatically when the device comes back online. Impacgo designs offline-first architecture so your field team never loses data due to network issues.
What does Power Apps development cost in India?
Power Apps development costs vary based on app complexity, number of screens, integrations required, and security requirements. A simple departmental app typically costs significantly less than a custom-developed mobile app. Microsoft Power Apps licensing (per user or per app) is separate. Contact Impacgo for a free consultation and detailed proposal based on your specific use case.
Build Your First Power App in 4-8 Weeks
Whether you're extending Dynamics 365, replacing paper-based processes, or building a mobile app for shop floor or field service — we can scope, design, and deliver your Power App in weeks, not months. Get a free consultation with our Power Platform team.